Interior to Lower Mainland Transmission Line (ILM)
Electrical Utilities / Products
OWNER
B.C. Hydro
CUSTOMER
Flatiron/Graham Joint Venture
OUR SCOPE
Design Assist, Detail and Fabricate 21 unique Tower “snow platforms”
QUANTITY
840 tons
TIMEFRAME
Apr. 2014- May 2015
CHALLENGES
Each of the 21 Platforms is uniquely designed to suit the terrain and the tower type. Each part of every platform is also unique. This made for thousands of different parts. The Drawings alone took 6 of our detailers almost 6 months to complete.
-Due to the remoteness of the sites, many of which were helicopter access only, It was imperative that the structures fit together properly in the field. To ensure this, each leg of each platform (84 legs in total) was trial fit in our shop. Field erectors later reported that the structures fit together extremely well and that assembly went quicker than expected.